Stormwater Management

Vermilion County Highway Department
2732 Batestown Road
Oakwood, IL 61858
 
Doug Staske, County Engineer
Phone: (217) 431-6682
e-mail: dstaske@comcast.net



 
 
 
 
 
 
 
 

 

Vermilion County's Stormwater Management Program meets the requirements of the Illinois EPA (IEPA).  The permit requires Vermilion County to comply with Phase II of the National Pollutant Discharge Elimination System (NPDES) Stormwater program for Municipal Separate Storm Sewer Systems (MS4) and allows the County to discharge stormwater into its receiving streams.
 
As a condition of the MS4 permit, the County must adopt and implement six minimum control measures to improve the water quality of its stormwater discharges.  The six minimum control measures are:
 
1. Public Education and Outreach
2. Public Participation and Involvement
3. Illicit Discharge Detection and Elimination
4. Construction Site Runoff Control
5. Post-construction Runoff Control
6. Pollution Prevention and Good Housekeeping
   
Collaboration:
The County collaborates with neighboring communities that also have MS4 permits by sharing information and resources to best comply with Vermilion County.
 
Files:
Annual Facility Inspection Report - March 2016 - March 2017
Annual Facility Inspection Report - March 2015 - March 2016
General Permit ILR40
NOI 2014 Final Report
 
To report a problem, contact Doug Staske:   e-mail: dstaske@comcast.net
 
Information on Storm Water
Rain Garden Information